Brooks Construction Bid for 2024-2 CCMG Road Resurfacing
Outcome: Passed 3-0
Accepted the bid from Brooks Construction for $924,984 for the 2024-2 CCMG road resurfacing project.
Presented by Highway Foreman Dave Dow.
Roll Call Vote
- John Lancaster (Republican)Aye
- Dan Borgenheimer (Republican)Aye
- Laura Pierce Coons (Republican)Aye