Dunkirk City Building Getting New Windows, Canopy, and Exterior Upgrades
From the Dunkirk City Council meeting on July 27, 2026
The mayor reported that Whole Jet Construction is redesigning the front of the Dunkirk city building. The project scope includes replacing single-pane windows with double-pane glass and new frames, adding a new canopy and exterior lettering, installing exterior lighting, and adding interior blinds. The existing front door, which is brand new, will stay as-is.
A formal quote will be presented to the council once received. No cost estimate or funding source was discussed at the meeting.
Source: Meeting transcript — City of Dunkirk - City Council Meeting - July 27, 2026
Some information may be inaccurate due to video audio quality.
About our reporting: The Blackford Ledger builds its government coverage from official public records, and every report is reviewed by an editor before publication. Read our Editorial Policy & Corrections or request a correction.