County Annex Leak Repaired, ADA Ramp Project Moving Forward
From the Blackford County Commissioner meeting on August 3, 2026
County Facilities Manager Megan reported two maintenance items at the county annex building.
A sanitary leak was discovered on the second floor, where pipes and a toilet were leaking into the first floor. The leak was caught early with minimal damage. Dunwitties has assessed the problem and is scheduling repair work, which will include some floor repair.
Separately, the county is getting quotes for a sidewalk and ADA-compliant ramp on the north side of the building. Measurements have been taken and contractors are being contacted.
Source: YouTube transcript — Blackford County Commissioner Meeting, August 3, 2026
Some information may be inaccurate due to video audio quality.
About our reporting: The Blackford Ledger builds its government coverage from official public records, and every report is reviewed by an editor before publication. Read our Editorial Policy & Corrections or request a correction.